Project Scope: This 10-storey hotel is built on a 2-storey concrete podium and has nearly 110,000 square feet. Fastwalls provided non load-bearing exterior CFS infill panels for floors 1&2. Floors 2-10 have load-bearing and non load-bearing walls, in addition to CFS wall panels in the stairwells and elevator shafts.

Hilton Garden Inn


Location:Colorado Springs, ColoradoType:Load-Bearing & Non Load-Bearing Wall PanelsStoreys:10Sq. Ft.109,560